2008 Beverage Deployment
Beverages are strung out, not having been reeled in over the summer.
They will need: - walked/repaired - feedlines run out - switch box repaired (smoke leaked out again)
Any volunteers to chair this committee ?
Posted Tue Oct 14 12:01:13 2008
field day
2006 field day plan
Gear
Tower 1
- Tower K0DAS's aluminum
- Antenna Tribander
Tower 2 wire antennas
- Tower 30 foot Rohn 25
- Antenna wires
Station 1
- Shelter Brunner Luse Pop-up Camper
- Radio ??? ?
Station 2
- Shelter Lind Pop-up Camper
- Radio ?? ?? ?
- amp Mait's SB-220
Electrical
- Generator A
- Case Diesel with PTO driven WinPower 15 kVA generator
- Generator B
- Greg's 10 kVA? self-powered unit
Posted Fri Jun 23 00:11:38 2006